KC Water reopens all lanes of Southwest Trafficway following sinkhole repairs

Posted on September 1, 2026

KC Water has reopened all lanes of Southwest Trafficway following the successful repair of a sinkhole that prompted emergency roadway closures and extensive infrastructure repairs.

Work began after KC Water was notified of a street cave-in along Southwest Trafficway shortly after 2 p.m. on Wednesday, August 26, 2026. Crews immediately responded to assess the situation, protect public safety, and determine the cause of the roadway failure.

Through its investigation, the Department determined the sinkhole was caused by the failure of a sewer line installed in 1892, when Southwest Trafficway was known as Summit Street. During repair operations, crews also identified a 30-inch transmission main installed in 1932, requiring additional coordination and specialized work to safely complete repairs.

Crews worked around the clock to stabilize the area, repair the damaged infrastructure, and restore the roadway. Thanks to their efforts, road restoration was completed approximately 15 hours ahead of schedule, allowing Southwest Trafficway to reopen sooner than anticipated.

This response was a collaborative effort involving multiple teams and partners, including:

Leath & Sons

SAK Construction, sewer lining

Ace Pipeline, cleaning, CCTV, and lined the manholes

Superior Bowen, restoration including paving

Streetwise, traffic control and street striping

KC Water crews conducted the street sweeping, construction inspection and management, and supported the team who worked with Leath & Sons.

KC Water and its partners would like to express their appreciation for the public’s patience throughout this process.